Back to Planning Applications

PA/2023/422

Application Details

Reference PA/2023/422
Proposed Development Planning permission for the construction and operation of a post-combustion carbon capture plant, including carbon dioxide compression and metering, cooling equipment, stacks, substations, new and modified services, connections, internal roads, new access onto Eastfield Road, and maintenance and laydown areas (EIA development)
Date Valid 20 March 2023
Decision
Consultation End Date 10 June 2023
Location
Site Location Phillips 66 Ltd, Eastfield Road, South Killingholme, DN40 3DW
Ward Ferry
Grid Reference 515577, 416786
Case Officer
Officer Name Dean Watson
Contact Number 01724 297000

Related Documents

Document Type Description Date  
Amended Documents Site Location Plan 26 September 2023
Application Form Download 27 March 2023
Drawing Layout Drawing H08 IEH Layout 2 November 2023
Drawing Proposed Temporary Access Junction Swept Path Analysis 2 of 2 24 April 2023
Drawing Proposed Temporary Access Junction Visibility Splay 24 April 2023
Drawing Figure 11 2 Zone of Theoretical Visibility Maximum - Phillips 66 FCC Carbon Capture Plant 24 April 2023
Drawing CCU Substation 24 Plans 24 April 2023
Drawing Construction Building Civil Layout Drawing 24 April 2023
Drawing Fig1 P66 Biodiversity Net Gain Baseline 24 April 2023
Drawing Fig2 Phillips 66 Biodiversity Net Gain Post-Intervention 24 April 2023
Drawing Fig3 Mayflower Wood Baseline 24 April 2023
Drawing Fig4 Mayflower Wood Post-Intervention 24 April 2023
Drawing H08 IEH Layout Plan 24 April 2023
Drawing HRA Appendix D - noise contour plot P66 alone 24 April 2023
Drawing HRA Appendix E - noise contour plot P66 with VPI 24 April 2023
Drawing Main Incoming Substation SS23 Plans 24 April 2023
Drawing Parameters Drawing - FCC Modifciations Elevations 24 April 2023
Drawing Parameters Drawing - Substation SS23 Elevations & Plan View 24 April 2023
Drawing Parameters Drawing Carbon Capture Unit Elevations 24 April 2023
Drawing Parameters Drawing Carbon Dapture unit Plot Plan 24 April 2023
Drawing Parts of the Site Plan 24 April 2023
Drawing Proposed Carbon Capture Unit Plot Plan 24 April 2023
Drawing Proposed Elevations & Plan View - Substation SS23 24 April 2023
Drawing Proposed Elevations - FCC Modifications 24 April 2023
Drawing Proposed Elevations - Main Carbon Capture Plant 24 April 2023
Drawing Proposed Permanent Access Junction General Arrangement Plan 24 April 2023
Drawing Proposed Permanent Access Junction Swept Path Analysis 24 April 2023
Drawing Proposed Permanent Access Junction Visibility Splay 24 April 2023
Drawing Proposed Temporary Access Junction General Arrangement Plan 24 April 2023
Drawing Proposed Temporary Access Junction Swept Path Analysis 1 of 2 24 April 2023
Drawing Tree Constraints Plan (Phillips 24 April 2023
Drawing 7 2c Daytime Noise Levels VPI & P66 Combined 24 April 2023
Drawing 9 1 Site Context & Surface Water Features 24 April 2023
Drawing 9 3 Fluvial & Tidal Flood Risk 24 April 2023
Drawing 11 5 Viewpoint Locations 24 April 2023
Drawing 13 1 Phillips66 Habitat Map 24 April 2023
Drawing 13 2 VPI Habitat Map 24 April 2023
Drawing 13 3 eDNA Ponds 24 April 2023
Drawing 13 4 Reptile Tin Locations 24 April 2023
Drawing 13 5 Winter Bird Survey Areas 24 April 2023
Drawing 13 6 Bat Detector Locations 24 April 2023
Drawing 13 7 Water Vole Survey 24 April 2023
Drawing 18 1 Long List Developments 15km 24 April 2023
Drawing 18 2 Short List Developments 15km 24 April 2023
Drawing Phillips 66 - Biodiversity Metric 3 1 ESL UPDATE 24 April 2023
Drawing 9 2 WFD WaterbodieS Plan 24 April 2023
Drawing Figure 7 4a Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 4m 24 April 2023
Drawing Figure 7 4b Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 4m 24 April 2023
Drawing Figure 7 4c Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the Phillips 66 and VPI Site at Noise Sensitive Receptors Height Above Ground 4m 24 April 2023
Drawing Figure 7 3b Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m 24 April 2023
Drawing Figure 7 3a Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 1 5m 24 April 2023
Drawing Figure 7 3c Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the Phillips 66 and VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m 24 April 2023
Drawing Figure 7 2b Predicted Daytime Construction Noise levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m 24 April 2023
Drawing Figure 7 2a Predicted Daytime Construction Noise levels (LAeq) from Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 1 5m 24 April 2023
Drawing Figure 7 1Baseline Sound Monitoring Locations 24 April 2023
Drawing Figure 6 17 In-Combination Future Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year 24 April 2023
Drawing Figure 6 16 In-Combination Future Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 15 P66Phillips 66 Future Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year 24 April 2023
Drawing Figure 6 14 Phillips 66 Future Assessment - Annual Mean NO2 Process Contribution 2021 Meteorological Year 24 April 2023
Drawing Figure 6 13VPI Future Assessment 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 12VPI Future Assessment Annual Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 11 In-Combination Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 10 6 10 In-Combination Baseline Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 9 Phillips 66 Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year 24 April 2023
Drawing Figure 6 8 Phillips 66 Baseline Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 7 VPI Baseline Assessment 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 6 VPI Baseline Assessment Annual Mean NO2 Process Contribution 2020 Meteorological Year 24 April 2023
Drawing Figure 6 5 Model Input Parameters - Phillips 66 Proposed Development 24 April 2023
Drawing Figure 11 4 Zone of Theoretical Visibility Maximum - Combined 24 April 2023
Drawing Figure 6 4 Model Input Parameters VPI Proposed Development 24 April 2023
Drawing Figure 6 3 Air Quality Study Area Ecological Receptors 24 April 2023
Drawing Figure 6 2 Air Quality Study Area Operation Human Health Receptors 24 April 2023
Drawing Figure 6 1 Air Quality Study Area Construction Dust Receptors 24 April 2023
Drawing Figure 3 4 Proposed Phillips 66 Development Site Layout Parameters Plan 24 April 2023
Drawing Figure 3 3 Proposed VPI Development Site Layout Parameters Plans 24 April 2023
Drawing Figure 3 2 Proposed Phillips 66 Development Indicative Layout 24 April 2023
Drawing Figure 3 1 Proposed VPI Development Indicative Layout 24 April 2023
Drawing Figure 2 3 Environmental Constraints Plan 15 km 24 April 2023
Drawing Figure 2 2 Environmental Constraints Plan 2km 24 April 2023
Drawing Figure 2 1 Site Boundaries and Parts of the Site 24 April 2023
Drawing Figure 1 3 Proposed VPI Development Application Boundary (the VPI Site) 24 April 2023
Drawing Figure 1 2 Proposed Phillips 66 Development Application Boundary (the Phillips 66 Site) 24 April 2023
Drawing Figure 1 1 Site Location Plan v3 24 April 2023
Drawing Figure 11 1 Local Landscape Character Plan 24 April 2023
Drawing Figure 11 3 Zone of Theoretical Visibility Maximum - VPI Immingham Carbon Capture Plant 24 April 2023
Drawing Figure 2 Phillips 66 Existing Site Plan 24 April 2023
Drawing Figure 6 3 Air Quality Study Area Ecological Receptors 27 April 2023
Drawing (Superseded) Figure1 Phillips 66 Site Location Plan 24 April 2023
General Documents Email trail 13 October 2023
General Documents HZ ES Chapter 7 - Noise and Vibration 24 April 2023
General Documents HZ ES Chapter 4 - Construction Programme and Management 24 April 2023
General Documents HZ ES Chapter 3 - Proposed Developments Need and Alternatives 24 April 2023
General Documents HZ ES Chapter 9 - Water and Flood Risk 24 April 2023
General Documents App 1B - Scoping Opinion 24 April 2023
General Documents HRA Appendix A - Special Protection Area citation 24 April 2023
General Documents HRA Appendix A - Special Arear of Conservation citation 24 April 2023
General Documents HRA Appendix A - RAMSAR citation 24 April 2023
General Documents Consultation Report - Submission 24 April 2023
General Documents Consultation Report - Appendix 8 - Social Media coverage 24 April 2023
General Documents Consultation Report - Appendix 7 - Virtual Consultation Room 24 April 2023
General Documents Consultation Report - Appendix 6 - Have Your Say Feedback Form 24 April 2023
General Documents Consultation Report - Appendix 5 - Exhibition Display Boards 24 April 2023
General Documents Consultation Report - Appendix 4 - Newspaper Notice 24 April 2023
General Documents Consultation Report - Appendix 3 - Community Newsletter 24 April 2023
General Documents Consultation Report - Appendix 2 Fig 2 - Website Response Form 24 April 2023
General Documents Consultation Report - Appendix 2 (shrunk) 24 April 2023
General Documents Consultation Report - Appendix 1 - Public Consultation Strategy 24 April 2023
General Documents Certificate B Notice - Phillips 66 24 April 2023
General Documents Ch 1 Introduction 24 April 2023
General Documents Ch 2 - Site and Site Surroundings 24 April 2023
General Documents Ch 10 - Geology 24 April 2023
General Documents Ch 11 - Landscape 24 April 2023
General Documents Ch 12 - Cultural Heritage 24 April 2023
General Documents Ch 13 - Ecology and Nature Conservation 24 April 2023
General Documents Ch 14 - Climate Change 24 April 2023
General Documents Ch 15 - Materials and Waste 24 April 2023
General Documents Ch 16 - Major Accidents & Disasters 24 April 2023
General Documents Ch 17 - Socio-Economics 24 April 2023
General Documents Ch 18 - Cumulative and Combined Effects 24 April 2023
General Documents Ch 19 - Summary of Significant Environmental Effects 24 April 2023
General Documents Ch 8 - Transport 24 April 2023
General Documents Fig 11 10 Viewpoint 5 24 April 2023
General Documents Fig 11 11 Viewpoint 6 24 April 2023
General Documents Fig 11 12 Viewpoint 7 24 April 2023
General Documents Fig 11 13 Viewpoint 8 24 April 2023
General Documents Fig 11 6 Viewpoint 1 24 April 2023
General Documents Fig 11 7 Viewpoint 2 24 April 2023
General Documents Fig 11 8 Viewpoint 3 24 April 2023
General Documents Fig 11 9 Viewpoint 4 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 1 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 2 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 3 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 4 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 5 24 April 2023
General Documents Figs 11 14-11 34 Photomontages Part 6 24 April 2023
General Documents HZ ES Chapter 6 - Air Quality 24 April 2023
General Documents Phillips 66 Cover Letter 24 April 2023
General Documents HZ ES Chapter 5 - Policy Context 24 April 2023
General Documents Response to NLC Highways Comments 27 July 2023
General Documents Response to Natural Englands Comments 27 July 2023
Supporting Document National Highways Response 2 - issued 27 March 2024 2 April 2024
Supporting Document Five Year Consent Request P66 5 September 2023
Supporting Document Transport clean FINAL 6 April 2023
Supporting Document EASTFIELD ROAD - RSA1 Response 10 August 2023
Supporting Document Phillips 66 response to Natural England 10 October 2023
Supporting Document Humber Zero Phillips 66 technical note on operational noise 11 October 2023
Supporting Document Framework WSI for Archaeological Trial Trenching Investigation Works 13 October 2023
Supporting Document Appendix 1 - Plan of Mayflower Wood 20 October 2023
Supporting Document Appendix 3 - Site Location Plan - Phillips 66 230816 20 October 2023
Supporting Document Appendix 2 -Biodiversity Metric 3 1 ESL UPDATE 20 October 2023
Supporting Document Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 5 24 April 2023
Supporting Document Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 4 24 April 2023
Supporting Document Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 2 24 April 2023
Supporting Document App 6C - Air Q Amine Assessment 24 April 2023
Supporting Document App 2A - Tree Survey Report 24 April 2023
Supporting Document Appendix 6A - Air Q Construction Phase Assessment 24 April 2023
Supporting Document App 11A - Landscape & Visual Impact Assessment Methodology 24 April 2023
Supporting Document Appendix 10A Annex A VPI Phase 1 Desk Study Envirocheck Part 1 24 April 2023
Supporting Document Appendix 10A Annex A VPI Phase 1 Desk Study Envirocheck Part 2 24 April 2023
Supporting Document Annexe B P66 Phase 1 Desk Study Envirocheck Part 6 24 April 2023
Supporting Document Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 1 24 April 2023
Supporting Document App 12A - Heritage Desk Based Assessment 24 April 2023
Supporting Document App 1A - Environmental Impact Assessment Scoping Report 24 April 2023
Supporting Document Annex B P66 Phase 1 Desk Study Envirocheck Part 3 24 April 2023
Supporting Document Phillips 66 - Planning Statement 24 April 2023
Supporting Document Phillips 66 - Design and Access Statement 24 April 2023
Supporting Document App 12B - Geophysical Survey 24 April 2023
Supporting Document App 12C - Report On Archaeological Observations of Geotechnical Investigations 24 April 2023
Supporting Document App 13A - Ecological Baseline Report 24 April 2023
Supporting Document App 14A - CCR Assessment 24 April 2023
Supporting Document App 9A - Flood Risk Assessment Part 1 24 April 2023
Supporting Document App 9A - Flood Risk Assessment Part 2 24 April 2023
Supporting Document App 9B - Water Framework Directive Screening Assessment 24 April 2023
Supporting Document Appendix 6B - Air Q Operational Phase Assessment 24 April 2023
Supporting Document App 9C - Drainage Strategies 24 April 2023
Supporting Document Humber Zero Non-Technical Summary 24 April 2023
Supporting Document Appendix 7B - Construction Noise 24 April 2023
Supporting Document App 1C - Statement of Competence 24 April 2023
Supporting Document App 7A - Noise Survey 24 April 2023
Supporting Document App 7C - Operational Noise 24 April 2023
Supporting Document App 8A - Transport Assessment 24 April 2023
Supporting Document App 8B - Construction Traffic Managment Plan 24 April 2023
Supporting Document App 8C - Construction Worker Travel Plan 24 April 2023
Supporting Document App 8D - Construction Worker Travel Plan Flow Diagrams 24 April 2023
Supporting Document Environmental Statement Volume III Cover and Table of Contents 24 April 2023
Supporting Document Phillips 66 Biodiversity Net Gain Report 24 April 2023
Supporting Document App 10A - Annex C VPI photolog 24 April 2023
Supporting Document App 10A - Phase 1 Geoenvironmental Desk Study 24 April 2023
Supporting Document Appendix 4A - Outline Construction Environmental Management Plan 24 April 2023
Supporting Document Phillips 66 Report to Inform Habits Regulations Assessment 24 April 2023
Supporting Document Enviornmental Statement Vol I Cover Glossary and Table of Contents 24 April 2023
Supporting Document Enviornmental Statement Vol II Cover Glossary and Table of Contents 24 April 2023
Supporting Document Appendix 14A Climate Change Risk Assessment 27 April 2023
Supporting Document Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 8 27 April 2023
Supporting Document Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 7 27 April 2023
Supporting Document HZ ES Vol II Cover Glossary and Table of Contents FINAL 28 April 2023
Supporting Document HZ ES Vol I Cover Glossary and Table of Contents FINAL 28 April 2023
Supporting Document Biodiversity Metric 31 August 2023

Application Comments

Type Name Date  
Consultation Reply Natural England 4 August 2023
Consultation Reply Highways
Highway Condition Codes
4 September 2023
Consultation Reply National Grid 5 June 2023
Consultation Reply Archaeology 5 June 2023
Consultation Reply Ecology 6 June 2023
Consultation Reply Environmental Protection 7 November 2023
Consultation Reply National Highways 8 January 2024
Consultation Reply Consultation reply from Environmental Protection 8 June 2023
Consultation Reply National Highways 11 March 2024
Consultation Reply Environment Agency 11 May 2023
Consultation Reply Humberside Fire and Rescue Service 12 May 2023
Consultation Reply North East Lindsey Drainage 13 April 2023
Consultation Reply Environmental Agency 20 April 2023
Consultation Reply Environmental Health 21 April 2023
Consultation Reply HSE 25 April 2023
Consultation Reply Natural England 25 May 2023
Consultation Reply Anglian Water Services Limited 26 April 2023
Consultation Reply Natural England 26 July 2023
Consultation Reply Network Rail 26 May 2023
Consultation Reply Ecology 28 July 2023
Consultation Reply Ecology 28 June 2023
Consultation Reply Archaeology 30 October 2023
Consultation Reply Tracy Rokahr (Crime Reduction Officer, Humberside Police) New Pin 5 June 2023
Consultation Reply Environmental Protection 2 June 2023
Consultation Reply Lead Local Flood Authority 31 May 2023
Consultation Reply Highways
Highway Condition Codes
26 May 2023
Consultation Reply Humberside Fire Brigade 18 April 2023
Consultation Reply HSE (Hazardous Substance Consents) 14 April 2023
Consultation Reply Highways
Highway Condition Codes
5 April 2023
Web Council 5 April 2023

Submit a Comment


Optional please only use if issued.