Proposed Development
Planning permission for the construction and operation of a post-combustion carbon capture plant, including carbon dioxide compression and metering, cooling equipment, stacks, substations, new and modified services, connections, internal roads, new access onto Eastfield Road, and maintenance and laydown areas (EIA development)
Date Valid
20 March 2023
Decision
Consultation End Date
10 June 2023
Location
Site Location
Phillips 66 Ltd, Eastfield Road, South Killingholme, DN40 3DW
Parish
South Killingholme
Ward
Ferry
Grid Reference
515577, 416786
Case Officer
Officer Name
Dean Watson
Contact Number
01724 297000
Contact Email
planning@northlincs.gov.uk
Related Documents
Document Type | Description | Date | |
---|---|---|---|
Amended Documents | Site Location Plan | 26 September 2023 | |
Application Form | Download | 27 March 2023 | |
Drawing | Layout Drawing H08 IEH Layout | 2 November 2023 | |
Drawing | Proposed Temporary Access Junction General Arrangement Plan | 24 April 2023 | |
Drawing | Proposed Temporary Access Junction Swept Path Analysis 1 of 2 | 24 April 2023 | |
Drawing | Proposed Temporary Access Junction Swept Path Analysis 2 of 2 | 24 April 2023 | |
Drawing | Proposed Temporary Access Junction Visibility Splay | 24 April 2023 | |
Drawing | Figure 6 17 In-Combination Future Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year | 24 April 2023 | |
Drawing | CCU Substation 24 Plans | 24 April 2023 | |
Drawing | Construction Building Civil Layout Drawing | 24 April 2023 | |
Drawing | Fig1 P66 Biodiversity Net Gain Baseline | 24 April 2023 | |
Drawing | Fig2 Phillips 66 Biodiversity Net Gain Post-Intervention | 24 April 2023 | |
Drawing | Fig3 Mayflower Wood Baseline | 24 April 2023 | |
Drawing | Fig4 Mayflower Wood Post-Intervention | 24 April 2023 | |
Drawing | H08 IEH Layout Plan | 24 April 2023 | |
Drawing | HRA Appendix D - noise contour plot P66 alone | 24 April 2023 | |
Drawing | HRA Appendix E - noise contour plot P66 with VPI | 24 April 2023 | |
Drawing | Main Incoming Substation SS23 Plans | 24 April 2023 | |
Drawing | Parameters Drawing - FCC Modifciations Elevations | 24 April 2023 | |
Drawing | Parameters Drawing - Substation SS23 Elevations & Plan View | 24 April 2023 | |
Drawing | Parameters Drawing Carbon Capture Unit Elevations | 24 April 2023 | |
Drawing | Parameters Drawing Carbon Dapture unit Plot Plan | 24 April 2023 | |
Drawing | Parts of the Site Plan | 24 April 2023 | |
Drawing | Proposed Carbon Capture Unit Plot Plan | 24 April 2023 | |
Drawing | Proposed Elevations & Plan View - Substation SS23 | 24 April 2023 | |
Drawing | Proposed Elevations - FCC Modifications | 24 April 2023 | |
Drawing | Proposed Elevations - Main Carbon Capture Plant | 24 April 2023 | |
Drawing | Proposed Permanent Access Junction General Arrangement Plan | 24 April 2023 | |
Drawing | Proposed Permanent Access Junction Swept Path Analysis | 24 April 2023 | |
Drawing | Proposed Permanent Access Junction Visibility Splay | 24 April 2023 | |
Drawing | Tree Constraints Plan (Phillips | 24 April 2023 | |
Drawing | 7 2c Daytime Noise Levels VPI & P66 Combined | 24 April 2023 | |
Drawing | 9 1 Site Context & Surface Water Features | 24 April 2023 | |
Drawing | 9 3 Fluvial & Tidal Flood Risk | 24 April 2023 | |
Drawing | 11 5 Viewpoint Locations | 24 April 2023 | |
Drawing | 13 1 Phillips66 Habitat Map | 24 April 2023 | |
Drawing | 13 2 VPI Habitat Map | 24 April 2023 | |
Drawing | 13 3 eDNA Ponds | 24 April 2023 | |
Drawing | 13 4 Reptile Tin Locations | 24 April 2023 | |
Drawing | 13 5 Winter Bird Survey Areas | 24 April 2023 | |
Drawing | 13 6 Bat Detector Locations | 24 April 2023 | |
Drawing | 13 7 Water Vole Survey | 24 April 2023 | |
Drawing | 18 1 Long List Developments 15km | 24 April 2023 | |
Drawing | 18 2 Short List Developments 15km | 24 April 2023 | |
Drawing | Phillips 66 - Biodiversity Metric 3 1 ESL UPDATE | 24 April 2023 | |
Drawing | 9 2 WFD WaterbodieS Plan | 24 April 2023 | |
Drawing | Figure 7 4a Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 4m | 24 April 2023 | |
Drawing | Figure 7 4b Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 4m | 24 April 2023 | |
Drawing | Figure 7 4c Predicted Operational Night-Time Unmitigated Noise Levels (LAeq) from the Phillips 66 and VPI Site at Noise Sensitive Receptors Height Above Ground 4m | 24 April 2023 | |
Drawing | Figure 7 3b Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 3a Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 3c Predicted Operational Daytime Unmitigated Noise Levels (LAeq) from the Phillips 66 and VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 2b Predicted Daytime Construction Noise levels (LAeq) from the VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 2a Predicted Daytime Construction Noise levels (LAeq) from Phillips 66 Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 1Baseline Sound Monitoring Locations | 24 April 2023 | |
Drawing | Figure 6 16 In-Combination Future Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 15 P66Phillips 66 Future Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 14 Phillips 66 Future Assessment - Annual Mean NO2 Process Contribution 2021 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 13VPI Future Assessment 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 12VPI Future Assessment Annual Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 11 In-Combination Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 10 6 10 In-Combination Baseline Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 9 Phillips 66 Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 8 Phillips 66 Baseline Assessment - Annual Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 7 VPI Baseline Assessment 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 6 VPI Baseline Assessment Annual Mean NO2 Process Contribution 2020 Meteorological Year | 24 April 2023 | |
Drawing | Figure 6 5 Model Input Parameters - Phillips 66 Proposed Development | 24 April 2023 | |
Drawing | Figure 11 4 Zone of Theoretical Visibility Maximum - Combined | 24 April 2023 | |
Drawing | Figure 6 4 Model Input Parameters VPI Proposed Development | 24 April 2023 | |
Drawing | Figure 6 3 Air Quality Study Area Ecological Receptors | 24 April 2023 | |
Drawing | Figure 6 2 Air Quality Study Area Operation Human Health Receptors | 24 April 2023 | |
Drawing | Figure 6 1 Air Quality Study Area Construction Dust Receptors | 24 April 2023 | |
Drawing | Figure 3 4 Proposed Phillips 66 Development Site Layout Parameters Plan | 24 April 2023 | |
Drawing | Figure 3 3 Proposed VPI Development Site Layout Parameters Plans | 24 April 2023 | |
Drawing | Figure 3 2 Proposed Phillips 66 Development Indicative Layout | 24 April 2023 | |
Drawing | Figure 3 1 Proposed VPI Development Indicative Layout | 24 April 2023 | |
Drawing | Figure 2 3 Environmental Constraints Plan 15 km | 24 April 2023 | |
Drawing | Figure 2 2 Environmental Constraints Plan 2km | 24 April 2023 | |
Drawing | Figure 2 1 Site Boundaries and Parts of the Site | 24 April 2023 | |
Drawing | Figure 1 3 Proposed VPI Development Application Boundary (the VPI Site) | 24 April 2023 | |
Drawing | Figure 1 2 Proposed Phillips 66 Development Application Boundary (the Phillips 66 Site) | 24 April 2023 | |
Drawing | Figure 1 1 Site Location Plan v3 | 24 April 2023 | |
Drawing | Figure 11 1 Local Landscape Character Plan | 24 April 2023 | |
Drawing | Figure 11 2 Zone of Theoretical Visibility Maximum - Phillips 66 FCC Carbon Capture Plant | 24 April 2023 | |
Drawing | Figure 11 3 Zone of Theoretical Visibility Maximum - VPI Immingham Carbon Capture Plant | 24 April 2023 | |
Drawing | Figure 2 Phillips 66 Existing Site Plan | 24 April 2023 | |
Drawing | Figure 6 3 Air Quality Study Area Ecological Receptors | 27 April 2023 | |
Drawing (Superseded) | Figure1 Phillips 66 Site Location Plan | 24 April 2023 | |
General Documents | Email trail | 13 October 2023 | |
General Documents | HZ ES Chapter 5 - Policy Context | 24 April 2023 | |
General Documents | HZ ES Chapter 7 - Noise and Vibration | 24 April 2023 | |
General Documents | HZ ES Chapter 4 - Construction Programme and Management | 24 April 2023 | |
General Documents | HZ ES Chapter 3 - Proposed Developments Need and Alternatives | 24 April 2023 | |
General Documents | Phillips 66 Cover Letter | 24 April 2023 | |
General Documents | Certificate B Notice - Phillips 66 | 24 April 2023 | |
General Documents | HZ ES Chapter 6 - Air Quality | 24 April 2023 | |
General Documents | App 1B - Scoping Opinion | 24 April 2023 | |
General Documents | HZ ES Chapter 9 - Water and Flood Risk | 24 April 2023 | |
General Documents | HRA Appendix A - Special Protection Area citation | 24 April 2023 | |
General Documents | HRA Appendix A - Special Arear of Conservation citation | 24 April 2023 | |
General Documents | HRA Appendix A - RAMSAR citation | 24 April 2023 | |
General Documents | Consultation Report - Submission | 24 April 2023 | |
General Documents | Consultation Report - Appendix 8 - Social Media coverage | 24 April 2023 | |
General Documents | Consultation Report - Appendix 7 - Virtual Consultation Room | 24 April 2023 | |
General Documents | Consultation Report - Appendix 6 - Have Your Say Feedback Form | 24 April 2023 | |
General Documents | Consultation Report - Appendix 5 - Exhibition Display Boards | 24 April 2023 | |
General Documents | Consultation Report - Appendix 4 - Newspaper Notice | 24 April 2023 | |
General Documents | Consultation Report - Appendix 3 - Community Newsletter | 24 April 2023 | |
General Documents | Consultation Report - Appendix 2 Fig 2 - Website Response Form | 24 April 2023 | |
General Documents | Ch 1 Introduction | 24 April 2023 | |
General Documents | Ch 2 - Site and Site Surroundings | 24 April 2023 | |
General Documents | Ch 10 - Geology | 24 April 2023 | |
General Documents | Ch 11 - Landscape | 24 April 2023 | |
General Documents | Ch 12 - Cultural Heritage | 24 April 2023 | |
General Documents | Ch 13 - Ecology and Nature Conservation | 24 April 2023 | |
General Documents | Ch 14 - Climate Change | 24 April 2023 | |
General Documents | Ch 15 - Materials and Waste | 24 April 2023 | |
General Documents | Ch 16 - Major Accidents & Disasters | 24 April 2023 | |
General Documents | Ch 17 - Socio-Economics | 24 April 2023 | |
General Documents | Ch 18 - Cumulative and Combined Effects | 24 April 2023 | |
General Documents | Ch 19 - Summary of Significant Environmental Effects | 24 April 2023 | |
General Documents | Ch 8 - Transport | 24 April 2023 | |
General Documents | Fig 11 10 Viewpoint 5 | 24 April 2023 | |
General Documents | Fig 11 11 Viewpoint 6 | 24 April 2023 | |
General Documents | Fig 11 12 Viewpoint 7 | 24 April 2023 | |
General Documents | Fig 11 13 Viewpoint 8 | 24 April 2023 | |
General Documents | Fig 11 6 Viewpoint 1 | 24 April 2023 | |
General Documents | Fig 11 7 Viewpoint 2 | 24 April 2023 | |
General Documents | Fig 11 8 Viewpoint 3 | 24 April 2023 | |
General Documents | Fig 11 9 Viewpoint 4 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 1 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 2 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 3 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 4 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 5 | 24 April 2023 | |
General Documents | Figs 11 14-11 34 Photomontages Part 6 | 24 April 2023 | |
General Documents | Consultation Report - Appendix 2 (shrunk) | 24 April 2023 | |
General Documents | Consultation Report - Appendix 1 - Public Consultation Strategy | 24 April 2023 | |
General Documents | Response to Natural Englands Comments | 27 July 2023 | |
General Documents | Response to NLC Highways Comments | 27 July 2023 | |
Supporting Document | Five Year Consent Request P66 | 5 September 2023 | |
Supporting Document | Transport clean FINAL | 6 April 2023 | |
Supporting Document | EASTFIELD ROAD - RSA1 Response | 10 August 2023 | |
Supporting Document | Phillips 66 response to Natural England | 10 October 2023 | |
Supporting Document | Humber Zero Phillips 66 technical note on operational noise | 11 October 2023 | |
Supporting Document | Framework WSI for Archaeological Trial Trenching Investigation Works | 13 October 2023 | |
Supporting Document | Appendix 1 - Plan of Mayflower Wood | 20 October 2023 | |
Supporting Document | Appendix 2 -Biodiversity Metric 3 1 ESL UPDATE | 20 October 2023 | |
Supporting Document | Appendix 3 - Site Location Plan - Phillips 66 230816 | 20 October 2023 | |
Supporting Document | App 10A - Annex C VPI photolog | 24 April 2023 | |
Supporting Document | App 10A - Phase 1 Geoenvironmental Desk Study | 24 April 2023 | |
Supporting Document | App 11A - Landscape & Visual Impact Assessment Methodology | 24 April 2023 | |
Supporting Document | App 12A - Heritage Desk Based Assessment | 24 April 2023 | |
Supporting Document | Appendix 6A - Air Q Construction Phase Assessment | 24 April 2023 | |
Supporting Document | Appendix 7B - Construction Noise | 24 April 2023 | |
Supporting Document | App 1C - Statement of Competence | 24 April 2023 | |
Supporting Document | App 12B - Geophysical Survey | 24 April 2023 | |
Supporting Document | Appendix 6B - Air Q Operational Phase Assessment | 24 April 2023 | |
Supporting Document | App 12C - Report On Archaeological Observations of Geotechnical Investigations | 24 April 2023 | |
Supporting Document | Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 5 | 24 April 2023 | |
Supporting Document | Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 4 | 24 April 2023 | |
Supporting Document | Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 2 | 24 April 2023 | |
Supporting Document | Appendix 10A Annex A VPI Phase 1 Desk Study Envirocheck Part 1 | 24 April 2023 | |
Supporting Document | Appendix 10A Annex A VPI Phase 1 Desk Study Envirocheck Part 2 | 24 April 2023 | |
Supporting Document | Annexe B P66 Phase 1 Desk Study Envirocheck Part 6 | 24 April 2023 | |
Supporting Document | Appendix 10A Annex B P66 Phase 1 Desk Study Envirocheck Part 1 | 24 April 2023 | |
Supporting Document | App 1A - Environmental Impact Assessment Scoping Report | 24 April 2023 | |
Supporting Document | Annex B P66 Phase 1 Desk Study Envirocheck Part 3 | 24 April 2023 | |
Supporting Document | Phillips 66 - Planning Statement | 24 April 2023 | |
Supporting Document | Phillips 66 - Design and Access Statement | 24 April 2023 | |
Supporting Document | App 13A - Ecological Baseline Report | 24 April 2023 | |
Supporting Document | App 14A - CCR Assessment | 24 April 2023 | |
Supporting Document | App 9A - Flood Risk Assessment Part 1 | 24 April 2023 | |
Supporting Document | App 9A - Flood Risk Assessment Part 2 | 24 April 2023 | |
Supporting Document | App 9C - Drainage Strategies | 24 April 2023 | |
Supporting Document | Phillips 66 Report to Inform Habits Regulations Assessment | 24 April 2023 | |
Supporting Document | App 9B - Water Framework Directive Screening Assessment | 24 April 2023 | |
Supporting Document | App 2A - Tree Survey Report | 24 April 2023 | |
Supporting Document | App 6C - Air Q Amine Assessment | 24 April 2023 | |
Supporting Document | App 7A - Noise Survey | 24 April 2023 | |
Supporting Document | App 7C - Operational Noise | 24 April 2023 | |
Supporting Document | App 8A - Transport Assessment | 24 April 2023 | |
Supporting Document | App 8B - Construction Traffic Managment Plan | 24 April 2023 | |
Supporting Document | App 8C - Construction Worker Travel Plan | 24 April 2023 | |
Supporting Document | App 8D - Construction Worker Travel Plan Flow Diagrams | 24 April 2023 | |
Supporting Document | Environmental Statement Volume III Cover and Table of Contents | 24 April 2023 | |
Supporting Document | Enviornmental Statement Vol II Cover Glossary and Table of Contents | 24 April 2023 | |
Supporting Document | Humber Zero Non-Technical Summary | 24 April 2023 | |
Supporting Document | Phillips 66 Biodiversity Net Gain Report | 24 April 2023 | |
Supporting Document | Appendix 4A - Outline Construction Environmental Management Plan | 24 April 2023 | |
Supporting Document | Enviornmental Statement Vol I Cover Glossary and Table of Contents | 24 April 2023 | |
Supporting Document | Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 8 | 27 April 2023 | |
Supporting Document | Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 7 | 27 April 2023 | |
Supporting Document | Appendix 14A Climate Change Risk Assessment | 27 April 2023 | |
Supporting Document | HZ ES Vol II Cover Glossary and Table of Contents FINAL | 28 April 2023 | |
Supporting Document | HZ ES Vol I Cover Glossary and Table of Contents FINAL | 28 April 2023 | |
Supporting Document | Biodiversity Metric | 31 August 2023 |
Application Comments
Type | Name | Date | |
---|---|---|---|
Consultation Reply | Natural England | 4 August 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
4 September 2023 | |
Consultation Reply | Archaeology | 5 June 2023 | |
Consultation Reply | National Grid | 5 June 2023 | |
Consultation Reply | Ecology | 6 June 2023 | |
Consultation Reply | Environmental Protection | 7 November 2023 | |
Consultation Reply | Consultation reply from Environmental Protection | 8 June 2023 | |
Consultation Reply | Environment Agency | 11 May 2023 | |
Consultation Reply | Humberside Fire and Rescue Service | 12 May 2023 | |
Consultation Reply | North East Lindsey Drainage | 13 April 2023 | |
Consultation Reply | Environmental Agency | 20 April 2023 | |
Consultation Reply | Environmental Health | 21 April 2023 | |
Consultation Reply | HSE | 25 April 2023 | |
Consultation Reply | Natural England | 25 May 2023 | |
Consultation Reply | Anglian Water Services Limited | 26 April 2023 | |
Consultation Reply | Natural England | 26 July 2023 | |
Consultation Reply | Network Rail | 26 May 2023 | |
Consultation Reply | Ecology | 28 July 2023 | |
Consultation Reply | Ecology | 28 June 2023 | |
Consultation Reply | Archaeology | 30 October 2023 | |
Consultation Reply | Tracy Rokahr (Crime Reduction Officer, Humberside Police) New Pin | 5 June 2023 | |
Consultation Reply | Environmental Protection | 2 June 2023 | |
Consultation Reply | Lead Local Flood Authority | 31 May 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
26 May 2023 | |
Consultation Reply | Humberside Fire Brigade | 18 April 2023 | |
Consultation Reply | HSE (Hazardous Substance Consents) | 14 April 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
5 April 2023 | |
Web | Council | 5 April 2023 |