Back to Planning Applications
PA/2023/421
Application Details
Reference
PA/2023/421
Proposed Development
Planning permission for the construction and operation of a post-combustion carbon capture plant, including carbon dioxide compressor and metering, cooling equipment, stacks, substations, internal roads, partial ditch realignment, new and modified services, connections, accesses, maintenance and laydown areas
Date Valid
15 March 2023
Decision
Consultation End Date
10 June 2023
Location
Site Location
VPI Power Station, Rosper Road, South Killingholme, DN40 3DZ
Parish
South Killingholme
Ward
Ferry
Grid Reference
516855, 417291
Case Officer
Officer Name
Dean Watson
Contact Number
01724 297000
Contact Email
planning@northlincs.gov.uk
Related Documents
Document Type | Description | Date | |
---|---|---|---|
Application Form | Download | 27 March 2023 | |
Drawing | Appendix 1 - Site Location Plan v2 | 19 October 2023 | |
Drawing | Vertical Parameter Zoning Planning Drawings Sections Sheet 2 | 24 April 2023 | |
Drawing | Co2 Compressor House Architectural Ground Floor Plan | 24 April 2023 | |
Drawing | Co2 Compressor House Architectural Roof Level Plan | 24 April 2023 | |
Drawing | Ditch Diversion Proposals Plan | 24 April 2023 | |
Drawing | Equipment Layout & Cable Gallery Plan | 24 April 2023 | |
Drawing | MVR Compresor House Architectural Plans & Sections | 24 April 2023 | |
Drawing | Parameter Zoning Planning Drawing Plan Sheet 1 | 24 April 2023 | |
Drawing | Parameter Zoning Planning Drawing Plan Sheet 2 | 24 April 2023 | |
Drawing | Parameter Zoning Planning Drawings Key Plan | 24 April 2023 | |
Drawing | Proposed General Arrangement Key Plan | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 1 | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 2 | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 3 | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 4 | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 5 | 24 April 2023 | |
Drawing | Proposed General Arrangement Plan Sheet 6 | 24 April 2023 | |
Drawing | Substaion 05 Equipment Layout & Cable Gallery Plan | 24 April 2023 | |
Drawing | Substation 04 Roof Level Plan & Section A-B | 24 April 2023 | |
Drawing | Substation 05 Roof Level Plan & Section S1 S2 | 24 April 2023 | |
Drawing | Tree Constraints Plan | 24 April 2023 | |
Drawing | Viewpoint Locations | 24 April 2023 | |
Drawing | Vertical Parameter Zoning Planning Drawings Sections Sheet 1 | 24 April 2023 | |
Drawing | Vertical Parameter Zoning Planning Drawings Sections Sheet 3 | 24 April 2023 | |
Drawing | Vertical Parameter Zoning Planning Drawings Sections Sheet 4 | 24 April 2023 | |
Drawing | Vertical Parameter Zoning Planning Drawings Sections Sheet 5 | 24 April 2023 | |
Drawing | Zone of Theoretical Visibility Maximum - Combined | 24 April 2023 | |
Drawing | Site Location Plan v2 | 24 April 2023 | |
Drawing | Proposed Access Junction Existing Underground Utilities Plan | 24 April 2023 | |
Drawing | Proposed Access Junction General Arrangement Plan | 24 April 2023 | |
Drawing | Proposed Access Junction Proposed Surfaces Plan | 24 April 2023 | |
Drawing | Proposed Access Junction Swept Path Analysis Plan | 24 April 2023 | |
Drawing | Proposed Access Junction Visibility Splays Plan | 24 April 2023 | |
Drawing | Proposed General Arrangement Elevations Plan Sheet 1 | 24 April 2023 | |
Drawing | Proposed General Arrangement Elevations Plan Sheet 2 | 24 April 2023 | |
Drawing | Proposed General Arrangement Isometric View | 24 April 2023 | |
Drawing | VPI Biodiversity Net Gain Baseline Plan | 24 April 2023 | |
Drawing | VPI Biodiversity Net Gain Post-Intervention | 24 April 2023 | |
Drawing | Model Input Parameters Phillips 66 v3 | 24 April 2023 | |
Drawing | Model Input Parameters VPI v2 | 24 April 2023 | |
Drawing | Proposed VPI Carbon Capture Plant Layout | 24 April 2023 | |
Drawing | Proposed VPI Carbon Capture Plant Parameters Plan | 24 April 2023 | |
Drawing | VPI Biodiversity Net Gain Report | 24 April 2023 | |
Drawing | Figure 13 4 Reptile Tin Locations | 24 April 2023 | |
Drawing | Figure 13 6 Bat Detector Locations Plan | 24 April 2023 | |
Drawing | Figure 18 2 Shortlist of Development Considered for Cumulative Impact Assessment | 24 April 2023 | |
Drawing | Figure 18 1 Longlist of Developments Initially Considered for Cumulative Impact Assessment | 24 April 2023 | |
Drawing | Figure 13 7 Water Vole Survey | 24 April 2023 | |
Drawing | Figure 13 2 VPI Site Habitat Map | 24 April 2023 | |
Drawing | Figure 13 3 eDNa Ponds Plan | 24 April 2023 | |
Drawing | Figure 13 5 Approximate Winter Bird Survey Areas Plan | 24 April 2023 | |
Drawing | Figure 9 2WFD Waterbodies Plan | 24 April 2023 | |
Drawing | Figure 9 3 Fluvial & Tidal Flood Risk Plan | 24 April 2023 | |
Drawing | Figure 7 2b Predicted Daytime Construction Noise Levels VPi Site Noise Sensitive Receptors 1 5m above groud | 24 April 2023 | |
Drawing | Figure 7 2a Predicted Daytime Construction Noise Levels Phillips66 Noise Sensitive Receptors 1 5m above groud | 24 April 2023 | |
Drawing | Figure 11 1 Local Landscape Character Plan | 24 April 2023 | |
Drawing | Figure 9 3 Site Context & Surface Water Features | 24 April 2023 | |
Drawing | Figure 13 1 Phillips 66 Site Habitat Map | 24 April 2023 | |
Drawing | Figure 2 1 Site Boundaries & Parts of the Sites | 24 April 2023 | |
Drawing | Figure 2 2 Environmental Constraints Plan 2km | 24 April 2023 | |
Drawing | Figure 2 3 Environmental Constraints Plan 15km | 24 April 2023 | |
Drawing | Figure 7 4a Predicted Operational Night-time Unmitigated Noise Levels VPi site at Noise Sensitive ReceptorsAbove 4m | 24 April 2023 | |
Drawing | Figure 7 4c Predicted Operational Night-time Unmitigated Noise Levels Phillips 66 & VPi Site Noise Sensitive Receptors Above 4m | 24 April 2023 | |
Drawing | Figure 7 4a Predicted Operational Night-time Unmitigated Noise Levels from P66 Site at Noise Sensitive Receptors Height Above Ground 4m | 24 April 2023 | |
Drawing | Firgure 7 3b Predicted Operational Daytime Unmitigated Noise Levels BPI Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 3a Predicted Operational Daytime Unmitigated Noise Levels P66 Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 3c Predicted Operational Daytime Unmitigated Noise Levels P66 & VPI Site at Noise Sensitive Receptors Height Above Ground 1 5m | 24 April 2023 | |
Drawing | Figure 7 2c Predicuted Daytime Construction Noise Levels P66 and VPI Site at Noise Sensitive Receptors Height Above Groud 1 5m | 24 April 2023 | |
Drawing | Figure 6 2 Air Quality Study Area - Operation Human Health Receptors | 24 April 2023 | |
Drawing | Figure 6 1 Air Quality Study Area - Construction Dust Receptors | 24 April 2023 | |
Drawing | Figure 6 17 In-Combination Future Assessment 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 | 24 April 2023 | |
Drawing | Figure 3 1 Proposed P66 Carbon Capture Plant Layout | 24 April 2023 | |
Drawing | Figure 11 2 Zone of Theoretical Visibility Maximum - Phillips 66 FCC Carbon Capture Plant | 24 April 2023 | |
Drawing | Figure 11 3 Zone of Theoretical Visibility Maximum - VPI Immingham Carbon Capture Plant | 24 April 2023 | |
Drawing | Figure 1 2 Proposed Phillips 66 Development Application Boundary (Phillips 66 Site) | 24 April 2023 | |
Drawing | Figure 6 14 Phillips 66 Future Assessment Annual NO2 Process Contribution 2021 | 24 April 2023 | |
Drawing | Figure 6 8 Phillips 66 Baseline Assessment Annual NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 3 3 Proposed P66 Carbon Capture Plant Parameters Plan | 24 April 2023 | |
Drawing | Figure 2 Existing Site Plan | 24 April 2023 | |
Drawing | Figure 7 1 Baseline Sound Monitoring Locations Plan | 24 April 2023 | |
Drawing | Figure 6 15 Phillips 66 Future Assessment 99 79th Percentile of 1 hour NO2 Process Contribution 2021 | 24 April 2023 | |
Drawing | Figure 1 1 Site Location Plan ER v3 | 24 April 2023 | |
Drawing | Figure 6 7 VPI Baseline Assessment 99 79th Percentile of 1hour mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 6 12 VPI Future Assessment Annual NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 6 6 VPI Baseline Assessment Annual Mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 6 13 VPI Future Assessment 99 79th Percentile of 1 hour mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 6 16 In Combination Future Assessment Annual mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figrue 6 9 Phillips 66 Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2021 | 24 April 2023 | |
Drawing | Figure 6 10 In-Combination Baseline Assessment - Annual Mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 6 11 In-Combination Baseline Assessment - 99 79th Percentile of 1 Hour Mean NO2 Process Contribution 2020 | 24 April 2023 | |
Drawing | Figure 1 3 Proposed VPI Development Application Boundary (VPI Site) | 24 April 2023 | |
Drawing | Figure 6 3 Air Quality Study Area Ecological Receptors | 27 April 2023 | |
Drawing | Figure 1 1 Site Location Plan | 28 April 2023 | |
General Documents | Annex C VPI Photolog | 21 April 2023 | |
General Documents | HZ ES Ch 17 - Socio-Economics | 24 April 2023 | |
General Documents | HZ ES Ch 18 - Cumulative and Combined Effects | 24 April 2023 | |
General Documents | HZ ES Ch 19 - Summary of Significant Environmental Effects | 24 April 2023 | |
General Documents | HZ ES Ch 2 Site and Site Surroundings | 24 April 2023 | |
General Documents | HZ ES Ch 3 - Proposed Developments Need and Alternatives | 24 April 2023 | |
General Documents | HZ ES Ch 4 - Construction Programme and Management | 24 April 2023 | |
General Documents | HZ ES Ch 5 - Policy Context | 24 April 2023 | |
General Documents | HZ ES Ch 6 - Air Quality | 24 April 2023 | |
General Documents | HZ ES Ch 7 - Noise and Vibration | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 5 - Exhibition Display Boards | 24 April 2023 | |
General Documents | HZ ES Ch 12 - Cultural Heritage | 24 April 2023 | |
General Documents | HZ ES Ch 11 - Landscape | 24 April 2023 | |
General Documents | Certificate B Notice - VPI | 24 April 2023 | |
General Documents | HZ ES Ch 10 - Geology | 24 April 2023 | |
General Documents | VPI Immingham - Biodiversity Metric 3 1 ESL UPDATE | 24 April 2023 | |
General Documents | HZ ES Ch 8 - Transport | 24 April 2023 | |
General Documents | HZ ES Ch 15 - Materials and Waste | 24 April 2023 | |
General Documents | HZ ES Ch 16 - Major Accidents & Disasters | 24 April 2023 | |
General Documents | HZ ES Ch 13 - Ecology and Nature Conservation | 24 April 2023 | |
General Documents | HRA Appendix A - RAMSAR citation | 24 April 2023 | |
General Documents | HZ ES Ch 9 - Water Environement and Flood Risk | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 1 - Public Consultation Strategy | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 2 (shrunk) | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 2 Fig 2 - Website Response Form | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 3 - Community Newsletter | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 4 - Newspaper Notice | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Submission | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 8 - Social Media coverage | 24 April 2023 | |
General Documents | HZ ES Ch 14 - Climate Change & Carbon | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 7 - Virtual Consultation Room | 24 April 2023 | |
General Documents | Humber Zero - Consultation Report - Appendix 6 - Have Your Say Feedback Form | 24 April 2023 | |
General Documents | VPI Covering Letter | 24 April 2023 | |
General Documents | Response to NLC Environment Comments | 27 July 2023 | |
General Documents | Response to Highways Comments | 27 July 2023 | |
General Documents | VPI Cover Letter | 28 April 2023 | |
Supporting Document | WSI for Mitigation Immingham VPI | 1 November 2023 | |
Supporting Document | National Highways Response 2 - issued 27 March 2024 | 2 April 2024 | |
Supporting Document | Report to Inform Habitats Regulations Aseessment | 2 November 2023 | |
Supporting Document | Five Year Consent Request (VPI) | 5 September 2023 | |
Supporting Document | Transport clean FINAL | 6 April 2023 | |
Supporting Document | Habitats Regulations Assessment | 8 February 2024 | |
Supporting Document | VPI response to Natural England | 10 October 2023 | |
Supporting Document | Humber Zero VPI technical note on operational noise | 11 October 2023 | |
Supporting Document | Framework WSI for Mitigation Immingham VPI V2 (004) | 16 November 2023 | |
Supporting Document | Technical Note - Response to Environmental Protection Team VPI | 19 December 2023 | |
Supporting Document | Draft Conditions | 19 October 2023 | |
Supporting Document | 231016 - S 106 - VPI Humber(143197990 4) (003) | 19 October 2023 | |
Supporting Document | Appendix 2 - BNG Metric 3 1 | 19 October 2023 | |
Supporting Document | HZ ES Ch 1 Introduction clean FINAL | 24 April 2023 | |
Supporting Document | Fig 11 13 Viewpoint 8 | 24 April 2023 | |
Supporting Document | Fig 11 6 Viewpoint 1 | 24 April 2023 | |
Supporting Document | Fig 11 7 Viewpoint 2 | 24 April 2023 | |
Supporting Document | Fig 11 8 Viewpoint 3 | 24 April 2023 | |
Supporting Document | Fig 11 9 Viewpoint 4 | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Figs 11 14-11 34 Photomontages | 24 April 2023 | |
Supporting Document | Humber Zero - VPI - Design and Access Statement | 24 April 2023 | |
Supporting Document | Humber Zero ES Volume III Cover and Table of Contents | 24 April 2023 | |
Supporting Document | Environmental Statement Volume II Appendices | 24 April 2023 | |
Supporting Document | HRA Appendix A - Special Protection Area citation | 24 April 2023 | |
Supporting Document | VPI Report to Inform Habitats Regulations Assessment | 24 April 2023 | |
Supporting Document | Aboricultural Survey Report & Tree Constraint Plans | 24 April 2023 | |
Supporting Document | Air Q Assessment of amine Degradation Products | 24 April 2023 | |
Supporting Document | Annex A VPI Envirocheck Part 1 | 24 April 2023 | |
Supporting Document | Annex A VPI Envirocheck Part 2 | 24 April 2023 | |
Supporting Document | Annex A VPI Envirocheck Part 3 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 1 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 2 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 3 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 4 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 5 | 24 April 2023 | |
Supporting Document | Annex B Phillips 66 Phase 1 Desk Study Envirocheck Part 6 | 24 April 2023 | |
Supporting Document | Environmental Impact Assessment Scoping Report | 24 April 2023 | |
Supporting Document | Appendix 4A Outline Construction Environmental Management Plan | 24 April 2023 | |
Supporting Document | HRA Appendix E - Noise Contour VPI & P66 Plan | 24 April 2023 | |
Supporting Document | Non-Technical Summary | 24 April 2023 | |
Supporting Document | HRA Appendix D - Noise Contour VPI Plan | 24 April 2023 | |
Supporting Document | Appendix 6B - Operational Phase Assessment | 24 April 2023 | |
Supporting Document | Appendix 6A - Construction Phase Assessment | 24 April 2023 | |
Supporting Document | Statement of Competence | 24 April 2023 | |
Supporting Document | Noise Survey | 24 April 2023 | |
Supporting Document | App 7B - Construction Noise Survey | 24 April 2023 | |
Supporting Document | App 7C - Operational Noise Survey | 24 April 2023 | |
Supporting Document | App 8A - Transport Assessment | 24 April 2023 | |
Supporting Document | App 8B - Construction Traffic Management Plan | 24 April 2023 | |
Supporting Document | App 8C - Construction Worker Travel Plan | 24 April 2023 | |
Supporting Document | App 9A - Flood Risk Assessment Part 1 | 24 April 2023 | |
Supporting Document | App 9A - Flood Risk Assessment Part 2 | 24 April 2023 | |
Supporting Document | HRA Appendix A - Special Area of Consultation citation | 24 April 2023 | |
Supporting Document | Scoping Opinion | 24 April 2023 | |
Supporting Document | App 9A - Flood Risk Assessment Part 2 | 24 April 2023 | |
Supporting Document | App 10A - Annex C VPI photolog | 24 April 2023 | |
Supporting Document | App 10A - Phase 1 Geo-Environmental & Geotechnical Desk Study | 24 April 2023 | |
Supporting Document | App 11A - Landscape & Visual Impact Assessment Methodology Report | 24 April 2023 | |
Supporting Document | App 12A - Heritage Desk Based Assessment Report | 24 April 2023 | |
Supporting Document | App 12B - Geophysical Survey Report | 24 April 2023 | |
Supporting Document | App 12C - Report On Archaeological Observations of Geotechnical Investigations | 24 April 2023 | |
Supporting Document | App 13A - Ecological Baseline Report | 24 April 2023 | |
Supporting Document | App 8D - Construction Worker Travel Plan Flow Diagrams | 24 April 2023 | |
Supporting Document | App 9B - Water Framework Directive Screening Assessment | 24 April 2023 | |
Supporting Document | App 9C - Drainage Strategies | 24 April 2023 | |
Supporting Document | HZ ES App 14A - CCR Assessment clean FINAL | 24 April 2023 | |
Supporting Document | Humber Zero - VPI - Planning Statement | 24 April 2023 | |
Supporting Document | Environmental Statement Volume I | 24 April 2023 | |
Supporting Document | Fig 11 10 Viewpoint 5 | 24 April 2023 | |
Supporting Document | Fig 11 11 Viewpoint 6 | 24 April 2023 | |
Supporting Document | Fig 11 12 Viewpoint 7 | 24 April 2023 | |
Supporting Document | Geoarchaeological Borehole Evaluation & Deposit Model Report | 24 July 2023 | |
Supporting Document | Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 8 | 27 April 2023 | |
Supporting Document | Appendix 10A Phase 1 Desk Study Annexe B Phillips 66 Envirocheck Report Part 7 | 27 April 2023 | |
Supporting Document | Appendix 14A Climate Change Risk Assessment | 27 April 2023 | |
Supporting Document | BNG Metric report | 28 April 2023 | |
Supporting Document | VPI Cover Letter | 28 April 2023 | |
Supporting Document | HZ VPI BNG Report | 28 April 2023 | |
Supporting Document | HZ ES Vol II Cover Glossary and Table of Contents | 28 April 2023 | |
Supporting Document | HZ ES Vol I Cover Glossary and Table of Contents FINAL | 28 April 2023 | |
Supporting Document | Humber Zero VPI response to EA comments on flood risk issued 22 6 23 | 28 June 2023 | |
Supporting Document | Habitats Regulations Assessment | 29 January 2024 | |
Supporting Document | Biodiversity Metric | 31 August 2023 |
Application Comments
Type | Name | Date | |
---|---|---|---|
Consultation Reply | Humberside Fire | 3 April 2023 | |
Consultation Reply | Natural England | 4 August 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
4 September 2023 | |
Consultation Reply | National Grid | 5 June 2023 | |
Consultation Reply | Aarchaeology | 5 June 2023 | |
Consultation Reply | Enviornmental Health | 5 May 2023 | |
Consultation Reply | Environment Agency | 7 July 2023 | |
Consultation Reply | Environmental Protection | 7 November 2023 | |
Consultation Reply | Natural Enland Response | 8 February 2024 | |
Consultation Reply | Consultation reply from Environmental Protection | 8 June 2023 | |
Consultation Reply | National Highways | 11 March 2024 | |
Consultation Reply | Environment Agency | 11 May 2023 | |
Consultation Reply | Humberside Fire and Rescue Service | 12 May 2023 | |
Consultation Reply | North East Lindsey Drainage Board | 13 April 2023 | |
Consultation Reply | Archaeology | 14 December 2023 | |
Consultation Reply | Environmental Protection | 15 January 2024 | |
Consultation Reply | National Highways | 17 January 2024 | |
Consultation Reply | Environment Agency | 18 April 2023 | |
Consultation Reply | Environmental Health | 21 April 2023 | |
Consultation Reply | North East Lindsey Drainage Board | 24 March 2023 | |
Consultation Reply | HSE | 25 April 2023 | |
Consultation Reply | Natural England | 25 May 2023 | |
Consultation Reply | Anglian Water Services Limited | 26 April 2023 | |
Consultation Reply | Network Rail | 26 May 2023 | |
Consultation Reply | Ecology | 28 July 2023 | |
Consultation Reply | Ecology | 28 June 2023 | |
Consultation Reply | Tracy Rokahr (Crime Reduction Officer, Humberside Police) New Pin | 5 June 2023 | |
Consultation Reply | Environmental Protection | 2 June 2023 | |
Consultation Reply | Lead Local Flood Authority | 31 May 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
26 May 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
5 April 2023 | |
Web | Council | 5 April 2023 | |
Consultation Reply | Tree Officer | 31 March 2023 |