Proposal
Application to discharge conditions attached to planning permission PA/2015/0481
Relating to
PA/2015/0481
Details of conditions to discharge
The details submitted are considered acceptable to comply with this condition
Condition
6.
No development shall take place until details of a scheme to provide safe vehicular and pedestrian access to the site across the A161 have been submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details prior to the occupation of not more than 50% of the dwellings.
No development shall take place until details of a scheme to provide safe vehicular and pedestrian access to the site across the A161 have been submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details prior to the occupation of not more than 50% of the dwellings.
Considered to be discharged following receipt of Formal Notice of a Deemed Discharge
Condition
5.
No development shall take place until details of a noise impact assessment and mitigation strategy have been submitted to and approved in writing by the local planning authority. The assessment and any required mitigation shall conform to guidance and standards as set out by the local planning authority prior to commencement of any monitoring. The assessment shall provide details of existing background noise levels, any likely noise sources that will impact on the living conditions of future residents and the predicted noise levels at sensitive locations after mitigation. All necessary mitigation measures shall be carried out in accordance with the approved details before first occupation and retained thereafter.
No development shall take place until details of a noise impact assessment and mitigation strategy have been submitted to and approved in writing by the local planning authority. The assessment and any required mitigation shall conform to guidance and standards as set out by the local planning authority prior to commencement of any monitoring. The assessment shall provide details of existing background noise levels, any likely noise sources that will impact on the living conditions of future residents and the predicted noise levels at sensitive locations after mitigation. All necessary mitigation measures shall be carried out in accordance with the approved details before first occupation and retained thereafter.
The submitted details are considered acceptable to comply with this condition.
Condition
7.
None of the dwellings shall be occupied until sewage disposal and surface drainage works have been completed in accordance with a scheme to be submitted to and approved in writing by the local planning authority.
None of the dwellings shall be occupied until sewage disposal and surface drainage works have been completed in accordance with a scheme to be submitted to and approved in writing by the local planning authority.
Related Documents
Document Type | Description | Date | |
---|---|---|---|
Application Form | Download | 17 March 2017 | |
Decision Notice | Download | 30 November 2017 | |
Drawing | Appendix 3 Crossing island plan | 17 March 2017 | |
Drawing | Appendix 4 Site/block plan | 17 March 2017 | |
Supporting Document | Appendix 2 Noise Impact Assessment (2nd report) | 17 March 2017 | |
Supporting Document | Appendix 1 Noise Impact Assessment | 17 March 2017 | |
Supporting Document | Appendix 3 Crossing islands | 17 March 2017 | |
Supporting Document | Supporting Statement | 17 March 2017 | |
Supporting Document | Appendix 5 Soakaways design | 17 March 2017 |
Comments
Type | Name | Date | |
---|---|---|---|
Consultation Reply |
Highways
Highway Condition Codes |
22 November 2017 | |
Consultation Reply | Environmental Health (Commercial) | 24 April 2017 | |
Consultation Reply | Drainage | 26 April 2017 | |
Consultation Reply | Severn Trent Water | 29 March 2017 |