DISCO PA/2023/1346

Applications for discharge of conditions are not open to public consultation and the Local Planning Authority will only accept responses from persons/organisations that have been formally consulted and requested to provide comments.

Application Details

Reference PA/2023/1346
Proposal Application to discharge conditions attached to planning permission PA/2022/1265 (conditions 3 and 6)
Relating to PA/2022/1265
Details of conditions to discharge
The Tree Officer has been consulted regarding the above condition but has not responded. Condition 6 is therefore discharged on the basis of the details provided with Arboricultural Method Statement BS 5837:2012. Condition

Before development is commenced, details of the method of protecting the existing trees on the site throughout the construction period shall be submitted to and approved in writing by the local planning authority, and such works as may be so approved shall be carried out before development is commenced and maintained until completion of the development. None of the trees so protected shall be wilfully damaged or destroyed, uprooted, felled, lopped, or topped, nor any other works carried out which would cause damage to the root systems or otherwise threaten the lives of the trees during the period of construction without the previous written consent of the local planning authority. Any trees removed without such consent or dying or being severely damaged or becoming seriously diseased during that period shall be replaced with trees of such size and species as may be agreed with the local planning authority.

Drainage have been consulted and have confirmed that the information provided is sufficient. Condition 3 is discharged on the basis of the details supplied: Below Ground Drainage Strategy 23130-HW-23-00-DR-C-5000 and in email outlining the use of porous materials dated 8/1/2024. Drainage have advised that the developer needs to fully consider the following informative comments prior to installing the proposed works: 1. Site Investigate to confirm/rule out infiltration potential and groundwater existence in accordance with BRE 365 testing requirements. 2. Connection into the existing network and affects this may have on the existing surface water drainage network. 3. It is assumed the school will maintain the proposed surface water drainage and will keep hold of the relevant drawings & documentation including maintenance frequencies. Condition

No development shall take place until a detailed surface water drainage scheme for the site is submitted and approved in writing by the local planning authority. The drainage scheme shall demonstrate that surface water run-off generated, up to and including the 1 in a 100-year critical storm and including an allowance for climate change which should be based on the current national guidance, will not exceed the run-off from the existing site. It shall also include details of how the resulting completed scheme is to be maintained and managed for the lifetime of the development so that flood risk, both on and off the site, is not increased. SuDS must be considered. Reference should be made to North Lincolnshire Council's SuDS and Flood Risk Guidance Document. The document is available to view on the website. Should infiltration not be feasible at the site, alternative sustainable drainage should be used, focusing on above-ground solutions.

Related Documents

Document Type Description Date  
Application Form Download 30 August 2023
Decision Notice Discharge of Conditions 2 February 2024
Drawing 23130-HW-23-00-DR-C-5000 Below Ground Drainage Strategy (condition 3) 30 August 2023
Supporting Document Agent Email - (materials) 18 January 2024
Supporting Document Arboricultural Method Statement (condition 6) 30 August 2023

Comments

Type Name Date  
Consultation Reply Drainage 15 January 2024
Consultation Reply Drainage 26 September 2023