DISCO PA/2022/1667

Applications for discharge of conditions are not open to public consultation and the Local Planning Authority will only accept responses from persons/organisations that have been formally consulted and requested to provide comments.

Application Details

Reference PA/2022/1667
Proposal Application to discharge conditions attached to planning permission PA/2021/2031 (condition 3)
Relating to PA/2021/2031
Details of conditions to discharge
With respect of condition 3 (Contaminated Land), this relates to the submission of a Site Investigation Report, Remediation Scheme, Verification Report and the Reporting of Unexpected Contamination. Comments have been sought from the Environmental Protection Team. A response from the Environmental Protection Team dated 31st January 2023 concludes that the department is satisfied with the findings of the site investigation and would recommend discharge of parts 1 and 2 of condition 3 and that the information is sufficient in order for development to commence. However, parts 3 and 4 shall remain outstanding until a Validation Report has been submitted and approved.

Therefore, parts 1 and 2 of condition 3 will be satisfied through the completion of works in accordance with the aforementioned details.
Condition 3.
Unless otherwise agreed by the local planning authority, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts 1 to 4 below have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the local planning authority in writing until part 4 has been complied with in relation to that contamination.


Part 1: Site Characteristics
An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the local planning authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the local planning authority. The report of the findings must include:

(i) a survey of the extent, scale and nature of contamination;

(ii) an assessment of the potential risks to:

- human health;

- property (existing or proposed), including buildings, crops, livestock, pets, woodland and service lines and pipes;

- adjoining land;

- groundwaters and surface waters;

- ecological systems;

- archaeological sites and ancient monuments;

(iii) an appraisal of remedial options, and a proposal of the preferred option(s).

This must be conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11'.

Part 2: Submission of Remediation Scheme
A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the local planning authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.

Part 3: Implementation of Approved Remediation Scheme
The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the local planning authority. The local planning authority must be given two weeks' written notification of commencement of the remediation scheme works.

Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the local planning authority.

Part 4: Reporting of Unexpected Contamination
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the local planning authority. An investigation and risk assessment must be undertaken in accordance with the requirements of Part 1, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of Part 2, which is subject to the approval in writing of the local planning authority.

Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the local planning authority in accordance with Part 3.

Related Documents

Document Type Description Date  
Application Form Download 4 October 2022
Decision Notice Download 1 February 2023
Drawing Phase 2 Borehole Location Plan (condition 3) 4 October 2022
Drawing Existing Location Plan 4 October 2022
Supporting Document Reconsult re Contam Assess and Rem Strat & comments re validation report 2 November 2022
Supporting Document Contamination Assessment and Remediation Strategy 2 November 2022
Supporting Document Soft Landscaping Specification (condition 3) 4 October 2022
Supporting Document Phase 2 (ground investigation) assessment report (condition 3) 4 October 2022
Supporting Document Further information re ground water (condition 3) 20 December 2022

Comments

Type Name Date  
Consultation Reply Environmental Protection 3 May 2023
Consultation Reply Environemtnal Protection 3 November 2022
Consultation Reply Environmental Protection 8 November 2022