DISCO PA/2021/1513
Applications for discharge of conditions are not open to public consultation and the Local Planning Authority will only accept responses from persons/organisations that have been formally consulted and requested to provide comments.
Application Details
Reference
PA/2021/1513
Proposal
Application to discharge conditions attached to planning permission PA/2017/1975
Relating to
PA/2017/1975
Details of conditions to discharge
The LLFA Drainage officer has confirmed that based on the revised drawings and supporting documentation dated 17th August 2022, Condition 16 can be discharged. Condition 16 is discharged
Condition
16.
No development shall take place until a strategy for the management of surface water drainage that includes the implementation of sustainable drainage systems, and their adoption and maintenance agreements, has been submitted to and agreed in writing by the local planning authority.
No development shall take place until a strategy for the management of surface water drainage that includes the implementation of sustainable drainage systems, and their adoption and maintenance agreements, has been submitted to and agreed in writing by the local planning authority.
Related Documents
Document Type | Description | Date | |
---|---|---|---|
Application Form | Download | 6 September 2021 | |
Decision Notice | Download | 13 January 2023 | |
Drawing | 2119-01-02-01 C - Section 38 Layout | 6 September 2021 | |
Drawing | 2119-01-06 C - Longitudinal Sections | 6 September 2021 | |
Drawing | 2119-01-07-01 B - Standard Drainage Details Sheet 1 of 2 | 6 September 2021 | |
Drawing | 2119-01-07-02 C - Standard Drainage Details Sheet 2 of 2 | 6 September 2021 | |
Drawing | 2119-01-08 C - External Works Layout | 6 September 2021 | |
Drawing | 2119-01-09-01 C- Impermeable Areas Layout | 6 September 2021 | |
Drawing | 2119-01-09-02 A - Gully Catchment Plan | 6 September 2021 | |
Drawing | 2119-01-09-03 A - Existing Highway Drain Area Layout | 6 September 2021 | |
Drawing | 2119-01-10 A - Flood Exceedance Layout | 6 September 2021 | |
Drawing | 2119-01-11 B - Surface & Foul Water Manhole Schedules | 6 September 2021 | |
Drawing | 2119-01-12-01 C - Flow Control Manholes Sheet 1 of 2 | 6 September 2021 | |
Drawing | 2119-01-12-02 - Flow Control Manholes Sheet 2 of 2 | 6 September 2021 | |
Drawing | 2119-01-15 - Road Setting Out Layout | 6 September 2021 | |
Drawing | 2119-01-16 - Highway Drain Improvement Scheme | 6 September 2021 | |
Drawing | 2119-01-17-01 B - S1 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-02 B - S2 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-03 B - S3 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-04 B - S4 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-05 B - S5 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-06 B - S6 Manhole | 6 September 2021 | |
Drawing | 2119-01-17-07 B - S7 Manhole | 6 September 2021 | |
Drawing | Existing Highway Drain | 6 September 2021 | |
Drawing | Highway 2119-01 100y 30 cc | 6 September 2021 | |
Drawing | SHE-0088-3000-0600-3000 Design Drawing | 6 September 2021 | |
Drawing | SHE-0088-3000-0600-3000 Hydraulc Characteristics | 6 September 2021 | |
Drawing | SHE-0110-5200-0857-5200 Design Drawing | 6 September 2021 | |
Drawing | SHE-0110-5200-0857-5200 Hydraulic Characteristics | 6 September 2021 | |
Drawing | 2119-01-03 D - Section 104 Layout | 6 September 2021 | |
Drawing | 2119-01-02-02 A - Surfacing & Kerbing Layout | 6 September 2021 | |
Drawing | 2119-01-04 A - Highway Construction Details | 6 September 2021 | |
Drawing | CB 01 2022 Site Plan showing Watercourse to be Maintained | 17 August 2022 | |
Drawing | CB 02 2022 Watercourse to be Maintained | 17 August 2022 | |
Supporting Document | CB 03 2022 Maintaince of Watercourse Letter | 17 August 2022 |
Comments
Type | Name | Date | |
---|---|---|---|
Consultation Reply | Drainage | 18 August 2022 | |
Consultation Reply | Drainage | 27 October 2021 |