Reference PA/2019/1067
Proposal Application to discharge conditions attached to planning permission PA/2019/501
Relating to PA/2019/501
Details of conditions to discharge
The information submitted to discharge the above condition is considered acceptable. The councils Highways Team have made an assessment and consider the information to be sufficient and state that condition 3 can therefore be discharged. Condition 3.
No development shall take place until a construction phase traffic management plan showing details of all associated traffic movements, including delivery vehicles and staff/construction movements, any abnormal load movements, contractor parking and welfare facilities, storage of materials and traffic management requirements on the adjacent highway, has been submitted to and approved in writing by the local planning authority. Once approved the plan shall be implemented, reviewed and updated as necessary throughout the construction period.
The information submitted to discharge condition 4 is considered acceptable. The LLFA have reviewed the information and considered it sufficient to discharge the said condition. Condition 4 is therefore discharged. Condition 4.
No development shall take place until a strategy for the management of surface water drainage, that includes the implementation of SuDS, and their adoption and maintenance arrangements, has been submitted to and agreed in writing by the local planning authority. Reference should be made to North Lincolnshire Council's SuDS and Flood Risk Guidance Document.

The applicant must:

(a) provide details of how run-off will be safely conveyed and attenuated during storms up to and including the 1 in 100 year critical storm event, with an allowance for climate change, from all hard surfaced areas within the development into the existing local drainage infrastructure and watercourse system without exceeding the run-off rate for the undeveloped site and not increasing the risk of flooding off-site;

(b) provide principle/detailed design (surveys, ground investigations, drawings, network details, calculations and modelling showing critical storm details) in support of any surface water drainage scheme, including details on any attenuation system and its discharge rates, and investigation into the condition of the existing outfall and proposed arrangements;

(c) provide details of how the scheme shall be maintained and managed over the lifetime of the development, including any arrangements for adoption by any public body or Statutory Undertaker and any other arrangements required to secure the operation of the drainage system throughout its lifetime;

(d) provide details of the timetable for and any phasing of implementation for the drainage scheme.
The information submitted on drawing 12130/P01 is considered acceptable. The plan shows the species type and location of planting to screen the proposed development. The condition is therefore considered discharged. Condition 6.
Prior to the first use, a scheme of landscaping shall be submitted to and agreed in writing with the local planning authority.

Related Documents

Document Type Description Date  
Application Form Download 3 July 2019
Decision Notice Download 11 January 2022
Drawing Landscaping (condition 6) 3 July 2019
Supporting Document Supporting letter 3 July 2019
Supporting Document Surface Water Drainage Design (condition 4) 3 July 2019
Supporting Document Construction Traffic Management Plan (condition 3) 3 July 2019

Comments

Type Name Date  
Consultation Reply Highways
Highway Condition Codes
9 July 2019
Consultation Reply Drainage 12 July 2019