PA/2025/254
Application Details
Reference
PA/2025/254
Proposed Development
Hybrid planning permission comprising: outline planning permission (with all matters reserved for subsequent consideration) for up to 550 dwellings, a local centre (use class E), associated landscaping, drainage and other infrastructure works; and full planning permission for the construction of a new vehicular access off the M181/A1077(M) roundabout, a pedestrian and cycle link to Scotter Road, a pumping station, earthworks and off-plot drainage, ecological and associated landscaping, and infrastructure works
Date Valid
27 February 2025
Decision
Consultation End Date
27 March 2025
Location
Site Location
Land east of the M181/A1077(M), Burringham, DN17 1US
Parish
Gunness
Grid Reference
486184, 409729
Case Officer
Officer Name
Dean Watson
Contact Number
01724 297000
Contact Email
planning@northlincs.gov.uk
Related Documents
| Document Type | Description | Date | |
|---|---|---|---|
| Supporting Document | Air Quality Assessment | 27 February 2025 | |
| Supporting Document | Appendices 8-12 | 27 February 2025 | |
| Supporting Document | Appendix 1 - Water Vole Survey Report | 27 February 2025 | |
| Supporting Document | Appendix 13 - Recreational Impacts Tech Note | 27 February 2025 | |
| Supporting Document | Appendix 2 - Bat Report | 27 February 2025 | |
| Supporting Document | Appendix 3 - Reptile Survey Report | 27 February 2025 | |
| Supporting Document | Appendix 4 - Great Crested Newt Report | 27 February 2025 | |
| Supporting Document | Appendix 6 - Breeding Bird Survey Report | 27 February 2025 | |
| Supporting Document | Appendix 7 - Wintering Bird Survey Report | 27 February 2025 | |
| Supporting Document | Appendix 7 - Wintering Bird Survey Report | 27 February 2025 | |
| Application Form | Download | 27 February 2025 | |
| Supporting Document | Cover Letter | 27 February 2025 | |
| Supporting Document | Arboricultural Assessment | 27 February 2025 | |
| Drawing | Borrowpit Section and Plan | 27 February 2025 | |
| Drawing | Building Heights Parameter Plan | 27 February 2025 | |
| Drawing | Circulation Strategy | 27 February 2025 | |
| Supporting Document | Design and Access Statement - Part1 | 27 February 2025 | |
| Supporting Document | Design and Access Statement - Part2 | 27 February 2025 | |
| Supporting Document | Design and Access Statement - Part3 | 27 February 2025 | |
| Supporting Document | Design and Access Statement - Part4 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Drainage Layout - Sheet 1 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Drainage Layout - Sheet 2 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Proposed Levels - Sheet 1 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Proposed Levels - Sheet 2 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Proposed Levels - Sheet 3 | 27 February 2025 | |
| Drawing | Detailed Infrastructure Proposed Levels - Sheet 4 | 27 February 2025 | |
| Supporting Document | Energy Statement | 27 February 2025 | |
| Drawing | Drainage Standard Details - Sheet 1 - LIN-BWB-DDG-XX-DR-D-0561-S8-P01 | 27 February 2025 | |
| Drawing | Drainage Standard Details - Sheet 2 - LIN-BWB-DDG-XX-DR-D-0562-S8-P01 | 27 February 2025 | |
| Drawing | Drainage Standard Details - Sheet 3 - LIN-BWB-DDG-XX-DR-D-0563-S8 -P01 | 27 February 2025 | |
| Supporting Document | Ecological Impact Assessment | 27 February 2025 | |
| Supporting Document | Framework Travel Plan | 27 February 2025 | |
| Drawing | Full Application Site Boundary Plan - 7730-SMR-00-ZZ-DR-A-2010-S3- P1 | 27 February 2025 | |
| Drawing | Foul Water Pumping Station Compound Arrangement Plan - LIN-BWB-CIV-XX-D-C-0565-S1-P01 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 1 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 2 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 3 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 4 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 5 | 27 February 2025 | |
| Supporting Document | Heritage Statement - Part 6 | 27 February 2025 | |
| Drawing | Highway Long Sections- LIN-BWB-HWY-XX-DR-C-0134-S8-P01 | 27 February 2025 | |
| Drawing | Highways Typical Sections Plan - LIN-BWB-HWY-XX-DR-C-0130-S8-P03 | 27 February 2025 | |
| Drawing | Highways Vehicle Tracking Phase 1 - LIN-BWB-HWY-XX-DR-C-0105-S8-P01 | 27 February 2025 | |
| Drawing | Highways Vehicle Tracking Phase 2 - LIN-BWB-HWY-XX-DR-C-0106S8-P01 | 27 February 2025 | |
| Drawing | Illustrative Highway Typical Sections - LIN-BWB-HWY-XX-DR-C-0131-S8-P04 | 27 February 2025 | |
| Supporting Document | Landscape Statement | 27 February 2025 | |
| Drawing | Land Use Parameter Plan - 7730-SMR-00-ZZ-DR-A-2010-S3-P1 | 27 February 2025 | |
| Drawing | Landscape Management Plan - REV-P01 - JAN 2025 | 27 February 2025 | |
| Supporting Document | Landscape Statement | 27 February 2025 | |
| Supporting Document | Noise Impact Assessment | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 1 | 27 February 2025 | |
| Drawing | Outline Application Site Boundary Plan - 7730-SMR-00-ZZ-DR-A-2011-S3-P1 | 27 February 2025 | |
| Drawing | Outline Drainage Strategy - LIN-BWB-CIV-XX-D-C-0500-S8-P03 | 27 February 2025 | |
| Drawing | Outline Levels Strategy - LIN-BWB-CIV-XX-DR-C-0600-S8-P02 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 2 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 3 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 4 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 5 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 6 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment - Part 9 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment -Part 7 | 27 February 2025 | |
| Supporting Document | Phase 1 Geo Environmental Assessment -Part 8 | 27 February 2025 | |
| Supporting Document | Phase 2 Geo Environmental Assessment - Part 1 | 27 February 2025 | |
| Drawing | Phase 1 - Works Sheet 1 - LIN-BWB-HWY-XX-DR-C-110-S8-PO4 | 27 February 2025 | |
| Drawing | Phase 1 - Works Sheet 2 - LIN-BWB-HWY-XX-DR-C-111-S8-PO4 | 27 February 2025 | |
| Supporting Document | Phase 2 Geo Environmental Assessment - Part 2 | 27 February 2025 | |
| Drawing | Phase 2 Works - LIN-BWB-HWY-XX-DR-C-112-S8-P04 | 27 February 2025 | |
| Drawing | Phasing Allocation Plan - 7730-SMR-00-ZZ-DR-A-2012-S3-P1 | 27 February 2025 | |
| Drawing | Phasing Parameter Plan - 7730-SMR-00-ZZ-DR-A-2020-S3-P1 | 27 February 2025 | |
| Drawing | Planting Strategy - P01-OP-CS-07-01-24 | 27 February 2025 | |
| Drawing | Proposed Contours with Existing Trees - 6024-OOB-ZZ-00-D-L-000010-P01 | 27 February 2025 | |
| Drawing | Proposed Site Sections Sheet 1 - 6024-OOB-ZZ-00-D-L-000010-P01 | 27 February 2025 | |
| Drawing | Landscape Site Plan - 6024- OOB- ZZ- 00- D- L- 000002-P01 | 27 February 2025 | |
| Drawing | Proposed Site Sections Sheet 2 - 6024-OOB-ZZ-ZZ-D-L-000051-P01 | 27 February 2025 | |
| Supporting Document | Rapid Health Impact Assessment | 27 February 2025 | |
| Supporting Document | Sustainability Statement | 27 February 2025 | |
| Supporting Document | Scotter Road Active Travel Proposals - LIN-BWB-HWY-XX-DR-TR-100-S8-P4 | 27 February 2025 | |
| Drawing | Site Location Plan - 7730-SMR-00-ZZ-DR-A-2001-S3-P1 | 27 February 2025 | |
| Drawing | Site Strip Co-ordination Plan - LIN-BWB-CIV-XX-D-C-0650-S1-P03 | 27 February 2025 | |
| Supporting Document | Statement of Community Involvement - Part 1 | 27 February 2025 | |
| Supporting Document | Statement of Community Involvement - Part 2 | 27 February 2025 | |
| Supporting Document | Statement of Community Involvement - Part 3 | 27 February 2025 | |
| Supporting Document | Surcharging Technical Note - LIN-BWB-EGT-XX-RP-LE-0001-TN | 27 February 2025 | |
| Supporting Document | Sustainable Drainage Statement | 27 February 2025 | |
| Supporting Document | Utilities Statement - Part 1 | 27 February 2025 | |
| Supporting Document | Utilities Statement - Part 2 | 27 February 2025 | |
| Supporting Document | Utilities Statement - Part 3 | 27 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 8 | 28 February 2025 | |
| Supporting Document | Transport Assessment - Part 2 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 2 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 3 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 4 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 5 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 6 | 28 February 2025 | |
| Supporting Document | Sustainable Drainage Statement - Part 7 | 28 February 2025 | |
| Supporting Document | Transport Assessment - Part 1 | 28 February 2025 | |
| Supporting Document | Transport Assessment - Part 3 | 28 February 2025 | |
| Supporting Document | Transport Assessment - Part 4 | 28 February 2025 | |
| Supporting Document | BNG Feasibility Report - Part 1 | 28 February 2025 | |
| Supporting Document | BNG Feasibility Report - Part 2 | 28 February 2025 | |
| Supporting Document | BNG Feasibility Report - Part 3 | 28 February 2025 | |
| Supporting Document | BNG Feasibility Report - Part 4 | 28 February 2025 | |
| Supporting Document | BNG Feasibility Report - Part 5 | 28 February 2025 | |
| Supporting Document | Flood Risk Assessment - Part 1 | 28 February 2025 | |
| Supporting Document | Flood Risk Assessment - Part 2 | 28 February 2025 | |
| Supporting Document | Lighting Strategy - Part 1 | 28 February 2025 | |
| Supporting Document | Lighting Strategy - Part 2 | 28 February 2025 | |
| Supporting Document | Statutory Biodiversity Metric | 28 February 2025 | |
| Supporting Document | Planning and Retail Statement - Lincolnshire Lakes (North) | 3 March 2025 | |
| Supporting Document (Superseded) | Planning and Retail Statement | 27 February 2025 | |
| Supporting Document | PA1 Figures 8-17 Photo view points A | 10 March 2025 | |
| Supporting Document | PA1 LVA Figures 1-7 opt | 10 March 2025 | |
| Supporting Document | PA1 LVA Report and Appendices A | 10 March 2025 | |
| Supporting Document | Transport Assessment | 15 April 2025 | |
| Supporting Document | Transport Assessment Addendum P02 - Part3 - LLP1-BWB-GEN-XX-RP-TR-0006 | 23 July 2025 | |
| Supporting Document | Transport Assessment Addendum P02 Part1 REDUCED - LLP1-BWB-GEN-XX-RP-TR-0006 | 23 July 2025 | |
| Supporting Document | Transport Assessment Addendum P02 Part2 REDUCED - LLP1-BWB-GEN-XX-RP-TR-0006 | 23 July 2025 | |
| Supporting Document | Viability Statement - Executive Summary | 23 September 2025 | |
| Supporting Document | Viability Statetment | 23 September 2025 | |
| Supporting Document | Independent Viability Appraisal | 23 September 2025 | |
| Supporting Document | Sustainable Drainage Strategy | 24 September 2025 | |
| Drawing | Scotter Road Active Travel Proposals - LIN-BWB-HWY-XX-DR-TR-100 - S8-P6 | 8 December 2025 | |
| Supporting Document | Avison Young Viability Rebuttal | 12 December 2025 | |
| Supporting Document | CPV Viability Rebuttal Response Appendices | 12 December 2025 | |
| Supporting Document | CPV Viability Rebuttal Response | 12 December 2025 | |
| Supporting Document | Active Travel Response | 28 January 2026 | |
| Supporting Document | Construction Traffic Management Plan | 2 February 2026 | |
| Drawing | National Highways Boundary Sketch - LIN-BWB-XX-XX-DR-C-0001 S2-P02 | 5 March 2026 |
Application Comments
| Type | Name | Date | |
|---|---|---|---|
| Consultation Reply | Historic England | 28 February 2025 | |
| Consultation Reply | Canal & River Trust | 3 March 2025 | |
| Consultation Reply | Humberside Fire & Rescue | 7 March 2025 | |
| Consultation Reply | Scunthorpe & Gainsborough WMB | 10 March 2025 | |
| Consultation Reply | National Grid | 17 March 2025 | |
| Consultation Reply | National Highways | 18 March 2025 | |
| Consultation Reply | Sport England | 19 March 2025 | |
| Consultation Reply | Active Travel England | 24 March 2025 | |
| Consultation Reply | Lincolnshire Wildlife Trust | 26 March 2025 | |
| Consultation Reply | Environmental Protection | 28 March 2025 | |
| Consultation Reply | Network Rail | 7 April 2025 | |
| Consultation Reply | Ecology | 10 April 2025 | |
| Consultation Reply | Environment Agency | 17 April 2025 | |
| Consultation Reply |
Highways
Highway Condition Codes |
24 April 2025 | |
| Consultation Reply | Archaeology | 2 May 2025 | |
| Consultation Reply | National Highways | 17 June 2025 | |
| Consultation Reply | National Highways | 15 September 2025 | |
| Consultation Reply | National Highways | 17 September 2025 | |
| Consultation Reply | Active Travel England | 2 October 2025 | |
| Consultation Reply | Habitats Regulations Assessment | 22 October 2025 | |
| Consultation Reply | National Highways | 30 October 2025 | |
| Consultation Reply | National Highways | 18 December 2025 | |
| Consultation Reply | Active Travel England | 23 December 2025 | |
| Consultation Reply | Active Travel England | 19 February 2026 | |
| Consultation Reply | Lead Local Flood Authority | 29 September 2025 | |
| Consultation Reply | Section 106 Officer | 13 June 2025 | |
| Consultation Reply | Spatial Planning | 10 June 2025 | |
| Consultation Reply | Lead Local Flood Authority | 10 June 2025 | |
| Consultation Reply | Tracy Rokahr (Crime Reduction Officer, Humberside Police) New Pin | 8 April 2025 | |
| Web | Health | 19 March 2025 | |
| Consultation Reply | Sewell Advisory | 18 March 2025 | |
| Web | Hancock | 7 March 2025 |