Back to Planning Applications
PA/2023/280
Application Details
Reference
PA/2023/280
Proposed Development
Planning permission for installation of new drainage infrastructure including dry lined basin to create wetland area to work as dispersion zone for surface water run-off.
Date Valid
2 March 2023
Decision
Approve with Conditions
Decision Date
4 August 2023
Consultation End Date
4 April 2023
Location
Site Location
Woodbine Park, South View Avenue, Brigg
Parish
Brigg
Ward
Brigg and Wolds
Grid Reference
500354, 407971
Case Officer
Officer Name
Paul Skelton
Contact Number
01724 297000
Contact Email
planning@northlincs.gov.uk
Related Documents
Document Type | Description | Date | |
---|---|---|---|
Amended Documents | Surface Water Drainage Arrangements | 21 July 2023 | |
Application Form | Application Form | 3 March 2023 | |
Decision Notice | PA | 4 August 2023 | |
Delegated Assessment | Download | 4 August 2023 | |
Drawing | Layout Plan Existing and Site Location Plan | 3 March 2023 | |
Drawing | Layout Plan Proposed and North Boundary Land Drain Section | 3 March 2023 | |
Drawing | Surface Water Drainage Typical Details | 3 March 2023 | |
Drawing (Superseded) | Surface Water Drainage Arrangements (DRAINAGE STRATEGY) | 3 March 2023 | |
Supporting Document | Windes Hydraulic Report | 3 March 2023 | |
Supporting Document | Agent response to Environmental Protection comments | 18 May 2023 | |
Supporting Document | Maintenance Strategy | 25 April 2023 | |
Supporting Document (Superseded) | Maintenance Strategy | 3 March 2023 |
Application Comments
Type | Name | Date | |
---|---|---|---|
Consultation Reply | Shires Group of IDBs | 14 March 2023 | |
Consultation Reply | Lead Local Flood Authority | 2 August 2023 | |
Consultation Reply | Lead Local Flood Authority | 20 July 2023 | |
Consultation Reply | Environmental Protection | 23 May 2023 | |
Consultation Reply | Lead Local Flood Authority | 3 May 2023 | |
Consultation Reply | Brigg Town Council | 29 March 2023 | |
Consultation Reply | Lead Local Flood Authority | 15 March 2023 | |
Consultation Reply |
Highways
Highway Condition Codes |
8 March 2023 | |
Consultation Reply | Environmental Protection | 8 March 2023 |
Submit a Comment
The consultation period for this application has now ended.