Proposed Development Planning permission for consent for enabling works associated with the construction of AMEP, a Nationally Significant Infrastructure Project which will include and extend beyond this application site. The proposal is to remove topsoil from three fields currently in agricultural use (amounting to approximately 35,000 cubic metres of material) and to import, deposit and compact approximately 140,000 cubic metres of clean stone fill material, raising levels from approximately 2.4 m AOD to a minimum of 3.1 m AOD, and creating a level, durable surface for use as a site compound for the contractors constructing the AMEP quay. Works will include the installation of piped crossings across existing ditches and new sub-surface drainage that will discharge into existing surface water ditches that outfall into the Humber Estuary
Date Valid 13 May 2013
Decision Approve with Conditions
Decision Date 21 July 2014
Consultation End Date 13 June 2013
Location
Site Location Land South East Of Access Track East, Off Rosper Road, North Killingholme,
Ward Ferry
Case Officer
Officer Name Legacy User
Contact Number 01724 297000

Related Documents

Document Type Description Date  
Amendments Revised Planning Application Boundary Revision 1 January 1801
Application Form - 16 May 2013
Consultation Replies Environmental Health 1 January 1801
Consultation Replies Environment Team (Appropriate Assessment) 1 January 1801
Consultation Replies Natural England 1 January 1801
Consultation Replies Environment Agency (Revised Response) 1 January 1801
Consultation Replies Highways 1 January 1801
Consultation Replies Natural England 1 January 1801
Consultation Replies RSPB 1 January 1801
Consultation Replies Environment Agency (Revised Response) 1 January 1801
Consultation Replies Environmental Health 1 January 1801
Consultation Replies Historic Environment Record 1 July 2013
Consultation Replies Network Rail 5 June 2013
Consultation Replies South Killingholme Parish Council 5 June 2013
Consultation Replies Environment Agency 5 June 2013
Consultation Replies English Heritage 5 June 2013
Consultation Replies Natural England 6 June 2013
Consultation Replies Public Health 7 June 2013
Consultation Replies North East Lindsey Drainage Board 7 June 2013
Consultation Replies Environment Team 12 June 2013
Consultation Replies Lincolnshire Wildlife Trust 17 June 2013
Consultation Replies Health and Safety Executive 17 May 2013
Consultation Replies Anglian Water 17 May 2013
Consultation Replies Linesearch 17 May 2013
Consultation Replies Network Rail 21 June 2013
Consultation Replies National Grid 22 May 2013
Consultation Replies Public Rights of Way 23 May 2013
Consultation Replies Environmental Health 24 June 2013
Consultation Replies Humberside Airport 24 May 2013
Consultation Replies Environmental Health 25 June 2013
Decision Notice - 1 January 1801
Delegated Report - 1 January 1801
Drawing Proposed Channel General Arrangement 1 January 1801
Drawing Planning Application Boundary 16 May 2013
Drawing Site Location Plan 16 May 2013
Drawing Bird Counts - Curlew 16 May 2013
Drawing Type A Ditch Crossing 16 May 2013
Drawing Type B Ditch Crossing 16 May 2013
Drawing Surface Water Drainage 16 May 2013
Drawing Ecological Constraints 16 May 2013
Drawing Topographical Survey 16 May 2013
Drawing General Site Layout 16 May 2013
Drawing Existing Services 16 May 2013
General Documents - 17 May 2013
Supporting Docs Flood Risk Assessment 1 January 1801
Supporting Docs Design and Access Statement 16 May 2013
Supporting Docs NON-TECHNICAL SUMMARY 20 May 2013
Supporting Docs SCOPING OPINION 20 May 2013